| Availability: | |
|---|---|
| Quantity: | |
PROFESSIONAL MANUFACTURER OFHONED TUBE, CHROME ROD,FOUNDED IN 2004, OPERATIONUNDER MODERN MANAGEMENT SYSTEM AND TECHNOLOGIESISO9001 CERTIFICATED,IT COVERS ANAREA OF40.000 SOMETERS.
ALL PROCESSING CONTROLED AND OWNED FULLY PRODUCTION FACILITIES ALSO OWNEDCOLD-DRAWN MACHINEAND HEATTREATMENTFURNACE.
| Item | Honed Tube | |
| Standard | DIN2391, EN10305, JIS G3445, ASTM A519, GB/T 8713... | |
| Material | ST45, ST52, E355, E355SR, STKM13C, SAE1026, 20#, Q235B, CK45... | |
| Heat treatment | BK+S | |
| Specification | Outer diameter(mm) | Inner diameter(mm) |
| 40-480mm | 30-400mm | |
| Thickness | 5-40mm | |
| Length | 7000mm | |
| Straightness | Max 0.5/1000mm | |
| Technology | Honed & SRB (SKIVED AND ROLLER BURNISHED) | |
| Tolerance INT | DIN2391 H8 | |
A: Yes! We are a professional honing tube manufacturer.
A: We usually quote within 24 hours after we get your inquiry by telling us the material, out diameter, wall thickness, quantity and application of the steel pipe which you need.
A: T/T or L/C according to real order.
A: It's usually about 30 days. At the same time, urgent order could also be arranged about 7 days.
PROFESSIONAL MANUFACTURER OFHONED TUBE, CHROME ROD,FOUNDED IN 2004, OPERATIONUNDER MODERN MANAGEMENT SYSTEM AND TECHNOLOGIESISO9001 CERTIFICATED,IT COVERS ANAREA OF40.000 SOMETERS.
ALL PROCESSING CONTROLED AND OWNED FULLY PRODUCTION FACILITIES ALSO OWNEDCOLD-DRAWN MACHINEAND HEATTREATMENTFURNACE.
| Item | Honed Tube | |
| Standard | DIN2391, EN10305, JIS G3445, ASTM A519, GB/T 8713... | |
| Material | ST45, ST52, E355, E355SR, STKM13C, SAE1026, 20#, Q235B, CK45... | |
| Heat treatment | BK+S | |
| Specification | Outer diameter(mm) | Inner diameter(mm) |
| 40-480mm | 30-400mm | |
| Thickness | 5-40mm | |
| Length | 7000mm | |
| Straightness | Max 0.5/1000mm | |
| Technology | Honed & SRB (SKIVED AND ROLLER BURNISHED) | |
| Tolerance INT | DIN2391 H8 | |
A: Yes! We are a professional honing tube manufacturer.
A: We usually quote within 24 hours after we get your inquiry by telling us the material, out diameter, wall thickness, quantity and application of the steel pipe which you need.
A: T/T or L/C according to real order.
A: It's usually about 30 days. At the same time, urgent order could also be arranged about 7 days.
